PASS PLAN REVIEW THE FIRST TIME
Submit a plan set with problems in it and the building department will find them — on their schedule. A correction letter, a redraw, a resubmittal, and weeks added to a project that hasn't broken ground. Send the set here first and you get that correction list before the city writes it: every item a plans examiner would flag, the code section behind it, and what fixes it on the drawing.
Written by an ICC-Certified Building Official who reviews permit sets from the other side of the counter.
Opens your email with the questions prefilled. Or write review@projectcalc.app directly.
Nothing is charged until you have heard back that I can take it.
What a plans examiner actually does with your set
Plan review is two passes. The first is a completeness check, often done at the counter before your set is even accepted: is there a site plan, are the drawings dimensioned, are member sizes and spans called out, is there enough on paper to review at all? A set that fails this one doesn't get corrections — it gets handed back, and you start over. The second pass is the code review: the examiner works through the drawings looking for the places where what you drew and what the adopted code requires disagree, and every disagreement becomes a numbered item on a correction letter.
That letter is the expensive part. Not the permit fee — the cycle. Each round of corrections means revising the drawings, resubmitting, and going back into the review queue, and on a busy counter each round is measured in weeks. Most correction letters on residential projects are full of findable problems: a guard drawn too short, a stair that doesn't work out, a beam with no size on it, a detail the examiner needs and cannot find. Findable problems can be found early, which is the entire service.
Why the edition matters more than usual right now
Jurisdictions are mid-changeover between the 2021 and 2024 International Residential Code, and the 2024 edition renumbered whole chapters— guards moved from R312 to R321, and R310 now means smoke alarms in the 2024 book when it meant emergency escape openings in the 2021. A plan note citing the wrong edition points your examiner at a completely different subject, so the first thing this check establishes is which book your city is actually enforcing — and every section in your report is numbered the way that edition prints it.
What this is, and what it isn't
This is code consulting: an experienced read of your drawings against the published code, in writing, so you can fix things while they are still lines on paper. It is nota design professional's stamp, not sealed engineering, and not an approval — only your building department can approve plans, and this check doesn't bind their review. Where something genuinely needs an engineer, the report tells you that before the city does.
Common questions
What exactly do I get back?
Does this mean my plans are approved?
What does the $149 cover, and what gets quoted instead?
Do you review plans in your own jurisdiction?
Is this engineering, or an official plan review?
How fast, and how do I pay?
Do you check zoning, setbacks, and HOA rules?
My drawings are hand-drawn. Is that a problem?
Brent J. — ICC-Certified Building Official · Founder of ProjectCalc